PLI Scheme to Promote Telecom & Networking Products Manufacturing In India

PLI Scheme to Promote Telecom & Networking Products Manufacturing In India

Reetu | Mar 1, 2021 |

PLI Scheme to Promote Telecom & Networking Products Manufacturing In India

PLI Scheme to Promote Telecom & Networking Products Manufacturing In India

MINISTRY OF COMMUNICATIONS

(Department of Telecommunications)

NOTIFICATION

New Delhi, the 24th February, 2021

SUBJECT: PRODUCTION LINKED INCENTIVE (PLI) SCHEME TO PROMOTE TELECOM AND NETWORKING PRODUCTS MANUFACTURING IN INDIA

F.No. 13-01/2020-IC.—1. Background

The Telecommunication sector has a pivotal role in facilitating the growth of economy. Telecom is key infrastructure and a key enabler of digital connectivity and Digital India. In the above context, it is necessary and desirable to incentivise manufacturing of Telecom Products in India.

2. Objectives

The Production Linked Incentive (PLI) Scheme will promote Telecom and Networking Products manufacturing in India. Accordingly, a financial incentive is proposed to boost domestic manufacturing and attract investments in the target segments of telecom and networking products in order to encourage “Make in India”. The Scheme is also expected to boost export of telecom and networking products “Made in India”.

3. Target Segments

Support under the Scheme will be provided to companies/entities engaged in manufacturing of specified telecom and networking products in India as listed in Annexure-1.

4. Eligibility

4.1 Eligibility will be subject to achievement of a minimum threshold of cumulative incremental investment over a period of four years and incremental sales of manufactured goods net of taxes (as distinct from traded goods) over the Base Year. The cumulative investment can be made at one go, subject to annual cumulative threshold as prescribed for four years being met. An applicant is expected to meet all the minimum threshold conditions to be eligible for disbursement of incentive. The Company/entity may invest in single or multiple eligible products to meet minimum incremental investment and sales threshold. The Scheme will also include contract manufacturers as defined in the FDI Policy Circular of 2017.

4.2 There will be a minimum investment threshold of ₹ 10 Crores for MSME and ₹ 100 Crores for others. Land and building cost will not be counted as investment.

4.3 Any beneficiary under this PLI Scheme will not be eligible to take benefit for the same products under any other PLI Scheme of Central Government. However, eligibility under PLI Scheme will not affect eligibility under any other Scheme being implemented by State/UT Governments and vice-versa.

4.4 Total number of beneficiaries will be limited owing to the fixed ceiling of the budgetary outlay. The beneficiaries will be decided through a transparent mechanism, to be finalized by the Competent Authority as per the Scheme Guidelines. Each beneficiary will have to meet the minimum incremental net sales criteria over the Base Year, as per column C of the table given in Annexure-2, to become eligible for the incentive. The amount of incentive given to each beneficiary will also be capped with a ceiling as per column D of the table or as decided by the Empowered Group of Secretaries (EGoS).

5. Base Year

Financial Year 2019-20 shall be treated as the Base Year for computation of cumulative incremental sales of manufactured goods net of taxes (as distinct from traded goods). Baseline information pertaining to production of beneficiary manufacturers will be captured to deduce and verify the cumulative incremental production over the base year.

6. Tenure of the Scheme

The scheme will be effective from 1st April, 2021. The investment will be permitted to be made in four years, subject to qualifying incremental annual thresholds, the support under the Scheme shall be provided for a period of five (5) years.

7. Review and Monitoring

Empowered Group of Secretaries (EGoS) chaired by Cabinet Secretary will monitor the PLI Scheme, undertake periodic review of the outgo under the Scheme, and take appropriate action to ensure that the expenditure is within the prescribed outlay. The Department of Telecommunications will finalize and notify the Scheme Guidelines. EGoS, within, the contours of Cabinet approval, can carry out any amendments in the Scheme Guidelines to ensure successful implementation on ground. Selection of the applicants to the Scheme will be done by the Department of Telecommunications.

8. Incentive Outlay

The PLI Scheme will be implemented within the overall financial limits of ₹ 12,195 Crores only (Rupees Twelve Thousand One Hundred and Ninety-Five Crore only) for implementation of the Scheme over a period of 5 years.

9. Applicable Incentives

The applicable incentive percentage for MSMEs will be 7% for Year 1 & Year 2, 6% for Year 3, 5% for Year 4 and 4% for year 5 on eligible sales over the base year. For category other than MSME, the applicable incentive percentage will be 6% for Year 1 & 2, 5% for Year 3 & 4 and 4% for year 5 on eligible sales over the base year. The incentive will be given subject to annual investment targets having been met.

10. Incentive per Company

The incentive per company will be applicable on sales of manufactured finished goods net of taxes, discounts, commissions etc. (as distinct from traded goods) subject to ceilings as indicated in the table at para 4.4 above (or as decided by the EGoS from time to time) and the company meeting the cumulative investment criteria as well. Total possible incentive for each applicant will be capped based on total investment committed at the time of application. This will be informed to the applicant at approval stage.

RAJESH KUMAR PATHAK, Dy. Director General (IC)

StudyCafe Membership

Join StudyCafe Membership. For More details about Membership Click Join Membership Button
Join Membership

In case of any Doubt regarding Membership you can mail us at [email protected]

Join Studycafe's WhatsApp Group or Telegram Channel for Latest Updates on Government Job, Sarkari Naukri, Private Jobs, Income Tax, GST, Companies Act, Judgements and CA, CS, ICWA, and MUCH MORE!"




Author Bio
My Recent Articles
Mysuru MP Yaduveer Wadiyar Seeks GST Exemption on Black Pepper Net Direct Tax Collection increases 16% annually to Rs.9.95 Trillion till September 17 Massive Tax Relief of Rs.21,000 Crore to DND flyover operator Noida Toll Bridge Company Zomato slapped with another GST Demand Notice of Rs.17.7 Crore Illustrative Management Representation Letter (MRL) for Tax Audi 2023-24View All Posts